Agro-industrial hub · Adamaoua

DIR Hub — The agro-industrial foundation of PROAQUI

5,380 hectares granted by the Republic of Cameroon · Bühler 160 tpd feed plant · CEMAC distribution.

Home · The Project · DIR Hub

Location and land status

Secured, immediately operational land


The DIR Hub is located in the Dir municipality, Mbéré department, Adamaoua Region, Republic of Cameroon. The plot granted by the Cameroonian State covers 5,380 hectares, of which 4,500 hectares are dedicated to agricultural production under center-pivot irrigation. The balance is allocated to industrial infrastructure, residential bases, environmental buffer zones (ecological corridors, grass strips) and land reserves for future extensions.

RegionAdamaoua, Republic of Cameroon
DepartmentMbéré
MunicipalityDir
Total land area5,380 hectares
Agricultural land under pivots4,500 hectares
Land statusLand granted by the Cameroonian State (land title)

DIR's four activities

Four activities, and four only


Activity 01

Agricultural hub — Maize and soy

4,500 hectares cultivated under center-pivot irrigation. Maize yield target 8–10 t/ha. Soy yield target 5–6 t/ha. Three-year rotation. Mixed mineral and organic fertilization (Mbakaou effluents via return loop). Target output: 50,000 tonnes of grain per year at steady state.

Activity 02

Bühler aquafeed plant

Capacity 160 tpd, 150,000 tpa. Three production lines: aquaculture, poultry, livestock. Metal silo storage 60,000 t (8 Bühler silos of 7,500 t). Bulk aquafeed shipment: 135,000 tpa to Mbakaou and Nyong via 30-tonne tanker trucks.

Activity 03

Agro-industrial residential base

Employee housing, collective catering, social and sports facilities. Accommodation capacity sized for permanent DIR Hub teams. Logistical coordination with the Mbakaou and Nyong aquaculture sites.

Activity 04

CEMAC distribution platform

Logistics center for distributing processed products to Cameroon and the broader CEMAC sub-region (Gabon, Chad, Central African Republic, Congo, Equatorial Guinea). Export flow coordination and cold chain.

Strict architectural rule

What DIR is not

DIR hosts NO hatchery, NO floating cages, NO aquaculture processing unit.

These functions are operated exclusively at the Mbakaou and Nyong aquaculture sites, which each have their own site-level hatchery and their own processing unit. This strict separation guarantees the coherence of the integrated value chain and the operational resilience of the project.

Discover the aquaculture sites

Mbakaou and Nyong